Sveza Manturovo

Sveza Manturovo

The cogeneration plant consists of 2 biomass-fired super-heated steam boiler plants (design 29 bar / 470°C – 16.1 MWth each), which supply steam to a steam turbine. The turbine is designed as an extraction condensing turbine (7.5 MWel).

Migros

Migros

The cogeneration plant consists of 2 biomass-fired super-heated steam boiler plants (design 29 bar / 470°C – 16.1 MWth each), which supply steam to a steam turbine. The turbine is designed as an extraction condensing turbine (7.5 MWel).

Dallesprom

Dallesprom

The cogeneration plant consists of 2 biomass-fired super-heated steam boiler plants (design 29 bar / 470°C – 16.1 MWth each), which supply steam to a steam turbine. The turbine is designed as an extraction condensing turbine (7.5 MWel).

Biostrom Oberhausen

Biostrom Oberhausen

Biostrom Oberhausen GmbH & Co. KG operates a biomass cogeneration plant on the premises of Energieversorgung Oberhausen AG (HKW II). There is already a gas cogeneration plant in operation, as well as a gas turbine for power generation and other steam boilers.

UAB Utenos

UAB Utenos

UAB “Utenos šilumos tinklai” is an energy supplier in the eastern Lithuania and is operating several hot water boilers and steam boilers on the premises of UAB “Utenos šilumos tinklai”.

Bio Energie Oberallgäu

Bio Energie Oberallgäu

The biomass cogeneration plant in Sonthofen, a town with 25,000 residents, supplies environmentally friendly heat to numerous public, commercial and private buildings.

Petrikovskiy

Petrikovskiy

Petrikovskiy RShKH was a pioneer in the field of retrofitting boiler houses and in the changeover to biomass fuel in Belarus. The installed Polytechnik 7.5 MWth steam boiler plant (10 t/h, 24 bar, 350°C) supplies heat to 11,000 residents.

Lesozavod 25 KWK2

Lesozavod 25 KWK2

KWK-2 consists of two steam boiler units (9,500 kWth per Boiler, 12.5 t/h steam, steam temperature 420°C, operational pressure 25 bar) and a turbine generator with a maximum electrical output of 3.3 MW.

Lesozavod25

Lesozavod25

“Lesozavod-25” is the largest sawmill in northwestern Russia. The plant belongs to the Titan group, which consists of more than 20 companies, and which owns facilities in the Archangelsk area and other regions.

Daegu 2

Daegu 2

In Daegu 2, a high-pressure super-heated steam boiler plant with 8,700 kWth and a saturated steam boiler plant with 7,000 kWth are being operated.

×

This website uses cookies to deliver a pleasant and user-friendly browsing experience. If you continue to browse, we consider that you accept the use of cookies on our website. Privacy Policy

This website uses cookies to deliver a pleasant and user-friendly browsing experience. If you continue to browse, we consider that you accept the use of cookies on our website.

close