Dallesprom KWK

„Amurskaja LK“

Boiler output: 2 x 18,000 kWth (3,1 MWel)

Combustion system: hydraulic reciprocating step grate

Fuel: wood chips, bark, residues out of veneer production

Year of construction: 2017

Location: Russia

Project description:

The saturated steam turbine with asynchronous generator (20 bar, 37.75 to/h) with an electrical output of up to 3,100 kW is fed into the sawmill’s network. The turbine’s waste steam is used for the heating of drying chambers and the customer’s shop floors via a HEIKO. The saturated steam of all three boiler plants (in total 3 x 18 MW) can optionally be used for power generation via the turbine.

×