Alpine Mayreder Rastenfeld

Boiler output: 2 x 10,700 kWth (5,000 kWel)

Combustion system: hydraulic reciprocating step grate

Fuel: wood chips, bark, sawdust

Year of construction: 2007

Location: Austria

Project description:

The three steam cogeneration plants are located in the north of Lower Austria, in the Waldviertel area. The plant located in Rastenfeld is a high-pressure super-heated steam boiler plant, constructed as a double-boiler plant. The thermal output of the boilers is 2 x 10,700 kW (fire tube boilers with 23 bar, 420°C). This plant produces 5,000 kWel by means of a steam turbine. The produced electrical output is fed into the local power grid.

Part of the thermal waste heat is used to supply a sawmill and a pellet plant with energy.

×

Ova web stranica koristi kolačiće kako bi pružila jednostavnost korištenja užitka surfanja. Ako nastavite, pretpostavlja se da prihvaćate upotrebu kolačića. Datenschutzerklärung

Ova web stranica koristi kolačiće kako bi pružila jednostavnost korištenja užitka surfanja. Ako nastavite, pretpostavlja se da prihvaćate upotrebu kolačića.

Schließen