コージェネ スチーム 0-4
The cogeneration plant consists of 2 biomass-fired super-heated steam boiler plants (design 29 bar / 470°C – 16.1 MWth each), which supply steam to a steam turbine. The turbine is designed as an extraction condensing turbine (7.5 MWel).
コージェネ スチーム 0-4
The cogeneration plant consists of 2 biomass-fired super-heated steam boiler plants (design 29 bar / 470°C – 16.1 MWth each), which supply steam to a steam turbine. The turbine is designed as an extraction condensing turbine (7.5 MWel).
コージェネ スチーム 0-4
The cogeneration plant consists of 2 biomass-fired super-heated steam boiler plants (design 29 bar / 470°C – 16.1 MWth each), which supply steam to a steam turbine. The turbine is designed as an extraction condensing turbine (7.5 MWel).
コージェネ スチーム 0-4, コージェネ
Biostrom Oberhausen GmbH & Co. KG operates a biomass cogeneration plant on the premises of Energieversorgung Oberhausen AG (HKW II). There is already a gas cogeneration plant in operation, as well as a gas turbine for power generation and other steam boilers.