The cogeneration plant consists of 2 biomass-fired super-heated steam boiler plants (design 29 bar / 470°C – 16.1 MWth each), which supply steam to a steam turbine. The turbine is designed as an extraction condensing turbine (7.5 MWel).
プロセス蒸気, プロセス蒸気 0 - 30 MWth
The cogeneration plant consists of 2 biomass-fired super-heated steam boiler plants (design 29 bar / 470°C – 16.1 MWth each), which supply steam to a steam turbine. The turbine is designed as an extraction condensing turbine (7.5 MWel).
プロセス蒸気, プロセス蒸気 0 - 30 MWth
Carmac Wjatskij Boiler output: 2 x 8,000 kW Combustion system: hydraulic reciprocating step grate Fuel: shredded bark, shredded wood chips (birch) Year of construction: 2017 Location:...