Daegu 2

Boiler output: 8,700 kW (high-pressure super-heated steam) and 7,000 kW (saturated steam), (750 kWel)

Combustion system: hydraulic reciprocating step grate

Fuel: wood chips, bark, sawdust

Year of construction: 2005

Location: South Korea

Project description:

In total, two power generation plants and three saturated steam boiler plants were supplied for Daegu. In Daegu 2, a high-pressure super-heated steam boiler plant with 8,700 kWth and a saturated steam boiler plant with 7,000 kWth are being operated. The turbine, which is located downstream of the high-pressure super-heated steam boiler plant, was provided on site and generates an electrical output of 750 kW.

The plants supply steam for a textile industry centre and an industrial park with many individual companies in the city of Daegu, South Korea. The steam is mainly required for dyeing factories.”

×

Această pagină web folosește Cookies pentru a permite o navigare adaptată utilizatorului. Dacă continuați, se presupune că sunteți de acord cu utilizarea de Cookies. Datenschutzerklärung

Această pagină web folosește Cookies pentru a permite o navigare adaptată utilizatorului. Dacă continuați, se presupune că sunteți de acord cu utilizarea de Cookies.

Schließen