Dallesprom KWK
„Amurskaja LK“
Boiler output: 2 x 18,000 kWth (3,1 MWel)
Combustion system: hydraulic reciprocating step grate
Fuel: wood chips, bark, residues out of veneer production
Year of construction: 2017
Location: Russia
Project description:
The saturated steam turbine with asynchronous generator (20 bar, 37.75 to/h) with an electrical output of up to 3,100 kW is fed into the sawmill’s network. The turbine’s waste steam is used for the heating of drying chambers and the customer’s shop floors via a HEIKO. The saturated steam of all three boiler plants (in total 3 x 18 MW) can optionally be used for power generation via the turbine.