Lebork

Boiler output: 7,050 kWth (1,278 kWel)

Combustion system: hydraulic reciprocating step grate

Fuel: wood chips, bark, sawdust

Year of construction: 2014

Location: Poland

Project description:

« The plant in Lebork was constructed by a consortium (Polytechnik Luft- und Feuerungstechnik GMBH and Polytechnik Polska Sp. z o.o). The construction time extended over the period from June 2014 until August 2015. The plant’s commissioning and trial operation took place from September to November 2015.

The investment was subsidised by Swiss Contribution with 85%. Thanks to this investment, 40% of the heat in the municipal system is now produced from biomass, a renewable source of energy. At the same time, Lębork is able to reduce its CO2 emissions by 40%. In November 2016, Lebork received an EU award for this investment: the EU GPP Award. »

×

Cette page Web utilise des cookies, pour améliorer et optimiser l'expérience de navigation de l'utilisateur. Si vous poursuivez votre navigation, nous considérons que vous acceptez l'utilisation de cookies sur notre site Web. Politique de confidentialité

Cette page Web utilise des cookies, pour améliorer et optimiser l'expérience de navigation de l'utilisateur. Si vous poursuivez votre navigation, nous considérons que vous acceptez l'utilisation de cookies sur notre site Web.

Schließen