ТЭЦ, ПАРОВЫЕ ТЭЦ 5-15
The cogeneration plant consists of 2 biomass-fired super-heated steam boiler plants (design 29 bar / 470°C — 16.1 MWth each), which supply steam to a steam turbine. The turbine is designed as an extraction condensing turbine (7.5 MWel).
ПАРОВЫЕ ТЭЦ 5-15
The plant located in Altweitra is a high-pressure super-heated steam boiler plant, constructed as a double-boiler plant. The thermal output of the boilers is 2 x 10,700 kW (fire tube boilers with 23 bar, 420°C).
ПАРОВЫЕ ТЭЦ 5-15
The three steam cogeneration plants are located in the north of Lower Austria, in the Waldviertel area.
ТЭЦ, ПАРОВЫЕ ТЭЦ 5-15
The three steam cogeneration plants are located in the north of Lower Austria, in the Waldviertel area. The plant located in Rastenfeld is a high-pressure super-heated steam boiler plant, constructed as a double-boiler plant.